Please report any broken links or trouble you might come across to the Webmaster. Please take a moment to let us know so that we can correct any problems and make your visit as enjoyable and as informative as possible.


NavSource Online: Service Ship Photo Archive


Contributed by Wolfgang Hechler

USNS Point Loma (T-EPF 15)


EPF-1 (Flight II) Class Expeditionary Fast Transport: (Flight II) includes enhanced medical facilities)
  • Laid down, 27 June 2023, at Austal USA in Mobile, AL.
  • Christened, 25 February 2023
  • Launched, 3 September 2024
    u>Specifications:
    Displacement 1,670 t.(lt)
    Length 337' 11"
    Beam 93' 6"
    Draft 12' 7"
    Speed
    33 kts with 380 metric tonnes Cargo
    23 kts with 231 metric tonnes mission payload (medical)
    Range
    1,200 nautical miles at 33 kts (full load)
    2,000 nautical miles at 21 ktd (medical cargo)
    4,700 nautical miles at 21 kts (no cargo)

    Complement 36 mariners
    Troop Capacity
    104 embarked force berths
    312 embarked seating capacity
    Medical Detachment
    3 VIP
    1 Officer-in-Charge
    147 embarked forces/medical support
    8 isolation/acute care
    Medical Beds
    2 operating rooms (1 major/1 minor procedure)
    23 medical ward beds (in ward/ICU)
    10 ICU beds (in ward/ICU)
    8 isolation/acute care (in berthing)

    Cargo Capacity 600 short tons in 20,000 sq. ft.
    Aircraft Capacity landing spot for up to V-22
    Watercraft Operations 11m RHIB launching and recovery system hydraulic painter boom
    Propulsion
    four MTU 20V8000 M71L Diesel engines
    four ZF 60000NR2H reduction gears
    four Wartsila WLD 1400 SR steerable, reversing waterjets

    Click On Image
    For Full Size Image
    Size Image Description Contributed
    By And/Or Copyright
    Point Loma
    097711501
    9821k Newly fitted out USNS Point Loma (T-EPF-15) at Austal USA, Mobile AL., 28 March 2025. Point Loma began sea trials 26 March 2025. In the assembly bay behind Point Loma is USNS Billy Frank Jr. (T-ATS-11), the first Navajo class fleet ocean tug and also first steel ship being built by Austal USA on the eve of her christening ceremony on the following morning.<John Deur Austral USA

    There is no DANFS history available for USNS Point Loma (T-EPF-15) at NavSource

    Navy Fact File - Expeditionary Fast Transport (EPF)

    Crew Contact And Reunion Information
    U.S. Navy Memorial Foundation - Navy Log

    Back To The Navsource Photo Archives Main Page Back To The Service Force Ship Type Index Back To The Expeditionary Fast Transport (EPF) Photo Index
    Comments, Suggestions, E-mail Webmaster.
    This page is created and maintained by Gary P. Priolo
    All pages copyright NavSource Naval History
    Last Updated 9 January 2026